I am remodeling my kitchen-where do I start? The appliances/sink/countertops granite will need to be put in?

mhteip asked:


I have selected appliances and granite. Who do I call first? What do I do with my new appliances I live in a three story home and do not want to move it twice. Help! I am overwhelmed!

home remodeling
This entry was posted on Wednesday, February 17th, 2010 at 4:25 pm and is filed under Home Improvement. You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.

6 Responses to “I am remodeling my kitchen-where do I start? The appliances/sink/countertops granite will need to be put in?”

  1. rfamilymember Says:

    Caffeinated Content

    start with the walls!

  2. ngiapapa Says:

    Caffeinated Content

    The usual sequence is that you have the old appliances and cupboards removed, then you have the new cupboards and apparrel installed and finally the sink and the electric appliances.
    What does your supplier suggest?

  3. rose22 use bleach pen,toothpaste Says:

    Caffeinated Content

    start with the counter because hardest to fit and cut the wood then measure the granite and have cut to same size, then install you sink etc. gl the shell is where you start meaning where things will eventually end up so start the wood of counter. gl

  4. vim Says:

    Caffeinated Content for WordPress

    Before placing anything, study and use the ‘triangle’ principle.
    For an effective kitchen you should have your refrigerator, oven and sink/dishwasher placed on a triangle format. Once you’ve figured that out, it will become very easy to move one. And always, leave twice as much counterspace as you think you will need. Hope this helps, and I envy your new kitchen!

  5. mapagmahal77 Says:

    Caffeinated Content

    Check for color coordination first! especially the ceiling and walls, your paint should “match” your appliance/equipment… Start from the the top (ceiling) then the walls then the floor… then the appliance.

  6. israelmoya20 Says:

    Caffeinated Content

    tell me more…..what are you doing? are you replacing the whole kitchen cabinets or just the appliances…? let me know how much have you done…or you are about to start?….i am a designer and a drafter….and i can assist you in the process but i need to charge you….but we can talk later about money….first email me at if you need my assistance